Products
- Solids Control Equipment
- Triple Deck Shale Shaker
- Shale Shaker
- Vacuum Degasser
- Mud Cleaner
- Desander
- Desilter
- Decanting Centrifuge
- Sludge Vacuum Pump
- Vertical Cutting Dryer
- Drying Shale Shaker
- Jet Mud Mixer
- Mud Agitator
- Centrifugal Pump
- Shear Pump
- Submersible Slurry Pump
- Mud Gun
- Mud Gas Separator
- Fire ignition device
- Screw Pump
- Hydration Tank
- Mud Tank
- Motor Control Center Room
- Screw Conveyor
- Offshore Mud Skip Container
- Barite Bulk Silo
- Solids Control System
- Spare Parts
Contact
Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China
+86-29-89305761
+86-29-89305769
Cases
-
ZJ50LDB Solids Control System in Russia
ZJ50LDB Solids Control System for Italy Hydraulic Drilling Rig in Russia ZJ50LDB...
-
350 GPM Mud Recycling System in Thailand
350 GPM Mud Recycling System in Thailand This 350GPM Mud recovery system is comp...
Company news
Delivery of a Finland Oilfield Drilling Fluids Waste Management
2020-07-01
On June 30th, Brightway officially shipped a skid-mounted drilling fluids waste management customized for the Finland oilfield drilling project.
The drilling fluids waste management consists of vertical cuttings dryer, decanter centrifuge, screw conveyor and pumps, etc. This system is an integral skid-mounted structure, which ensures that the drilling cutting waste drying, separation, control, and transportation work smoothly. It also improves the processing efficiency and reduces the customer's Input costs. The drilling fluids waste management can process 40 tons of drilling waste per hour. During the treatment of drilling wastes, no additives are required. The water content of water-based drill cuttings is controlled below ≤10%, and oil content of oil-based drill cuttings is 5 %~8%, which meet the requirements of“no pit”, “zero emission” and “zero addition”on drilling site.
At present, the drilling fluids waste management is officially sent to Finland and is expected to arrive at the customer's oil field site in August. At that time, according to the needs of the customer's working conditions, Brightway professional and technical personnel will help customers install and commissioning on site, and maintain system equipment.
Know more about‘drilling fluids waste management', please visit: http://www.brightwaysolids.com/Drilling-Waste-Management_d13
Previous :Drilling Cutting Disposal System Sent to Moldova in Europe
Next :Delivery of 18.5KW Submersible Slurry Pumps to Kuwaiti Customer